'Australian National Moorings Network' (ANMN) is a facility of the Australian 'Integrated Marine Observing System' (IMOS) project. This data set was collected by the ANMN sub-facility 'National Reference Systems' (NRS) and contains data from the following sensor deployments:
There have been 8 deployments for the Peak Wave Period data set.
Instrumentation was deployed for measuring Peak Wave Period from 03 Jul 2010 through to 29 Jan 2011, and the installation was located at/on Darwin NRS Buoy - OLD Latitude:-12.33731 - Longitude:130.6961. Sensor deployed was a Teledyne RD Instruments WHSW600-I-NEMO 13881 manufactured by Teledyne RD Instruments, model WHSW600-I-NEMO.
Instrumentation was deployed for measuring Peak Wave Period from 04 Sep 2012 through to 13 Dec 2012, and the installation was located at/on Darwin NRS Buoy - OLD Latitude:-12.33731 - Longitude:130.6961. Sensor deployed was a Teledyne RD Instruments WHSW600-I-NEMO 13881 manufactured by Teledyne RD Instruments, model WHSW600-I-NEMO.
Instrumentation was deployed for measuring Peak Wave Period from 10 Dec 2012 through to 17 Jun 2013, and the installation was located at/on Darwin NRS Buoy - OLD Latitude:-12.33731 - Longitude:130.6961. Sensor deployed was a Teledyne RD Instruments WHSW600-I-NEMO 13881 manufactured by Teledyne RD Instruments, model WHSW600-I-NEMO.
Instrumentation was deployed for measuring Peak Wave Period from 28 Jun 2013 through to 01 Dec 2013, and the installation was located at/on Darwin NRS Buoy - OLD Latitude:-12.33731 - Longitude:130.6961. Sensor deployed was a Teledyne RD Instruments WHSW600-I-NEMO 13881 manufactured by Teledyne RD Instruments, model WHSW600-I-NEMO.
Instrumentation was deployed for measuring Peak Wave Period from 24 Jan 2014 through to 16 Feb 2015, and the installation was located at/on Darwin NRS Buoy - OLD Latitude:-12.33731 - Longitude:130.6961. Sensor deployed was a Teledyne RD Instruments WHSW600-I-NEMO 13881 manufactured by Teledyne RD Instruments, model WHSW600-I-NEMO.
Instrumentation was deployed for measuring Peak Wave Period from 14 Feb 2015 through to 18 Aug 2015, and the installation was located at/on Darwin NRS Buoy Latitude:-12.34326 - Longitude:130.7151. Sensor deployed was a Teledyne RD Instruments WHSW600-I-NEMO 13881 manufactured by Teledyne RD Instruments, model WHSW600-I-NEMO.
Instrumentation was deployed for measuring Peak Wave Period from 11 Aug 2015 through to 27 Jul 2016, and the installation was located at/on Darwin NRS Buoy Latitude:-12.34326 - Longitude:130.7151. Sensor deployed was a Teledyne RD Instruments WHSW600-I-NEMO 13881 manufactured by Teledyne RD Instruments, model WHSW600-I-NEMO.
Instrumentation was deployed for measuring Peak Wave Period from 27 Jul 2016 through to 07 Oct 2016, and the installation was located at/on Darwin NRS Buoy Latitude:-12.34326 - Longitude:130.7151. Sensor deployed was a Teledyne RD Instruments WHSW600-I-NEMO 13881 manufactured by Teledyne RD Instruments, model WHSW600-I-NEMO.